Product · Budget
Each site's link, with its doubt.
A link budget per site that knows how wrong the planning model can be.
1
Planner model against terrain truth
2
Endpoints at the edge flagged
3
Location-tagged reports where they exist
What it needs
- Site list and endpoint positions
What it is not
- Terrain over a real elevation model is phase 2
Works with
See Budget on your asset.
Tournament run checked in. Simulation only. Not yet on a real asset. A conversation first; a data pilot when the engine has earned it.